Taiwan 3.132 MWh / 1.5 MW Grid-Connected BESS
A grid-connected battery energy storage system in Taiwan
Project Overview
A 3.132 MWh / 1.5 MW grid-connected BESS in Taiwan, composed of six ~522 kWh / 250 kW liquid-cooled storage units with integrated combiner / control cabinets and related ESTS / UPS functions, unified by a self-developed EMS.
System Architecture
Layered architecture of storage units + combiner / control cabinet + self-developed EMS, coordinating grid-side and battery-side management with fast switching. Final topology per project documentation.
Energy Storage Configuration
3.132 MWh / 1.5 MW; six ~522 kWh / 250 kW liquid-cooled units; LFP cells (314Ah referenced in public data); IP54 (to be verified against final project data).
EMS & Control
Self-developed EMS for topology visualization, real-time monitoring, PCS / SOC tracking, control strategies and data analytics; manual charge / discharge and automatic / scheduled operation.
Monitoring & Data
Unit-level monitoring, PCS power and SOC tracking, revenue / operation analytics; communication with PCS, BMS, liquid cooling, smart meters (protocols per actual project config).
Key Engineering Capabilities
Demonstrates TAOKE integrated capability across hardware, embedded / edge computing, communication, industrial software, control and EMS — a real instance of monitoring/control to intelligent optimization.
Results / Performance
Public data mentions grid-to-battery switch time under 20 ms; other performance, revenue and client details follow the company’s final project data and are not fabricated on the site.
Note: the case page does not include unverified revenue figures, client names, project addresses, contract amounts or performance guarantees; parameters are verified against final project data.
Project Site
Taiwan 3.132 MWh / 1.5 MW grid-connected BESS site.






TK-EMS system architecture
Interested in a similar storage / energy solution?
Copyright © 2026 Elite Construction WordPress Theme | Powered by WordPress.org